Kappara Flyover — targets

Question

Jista’ l-Ministru jgħid jekk fil-każ tal-flyover tal-Kappara nżammux it-targets li l-Ministeru kellu prestabbiliti, kemm mil-lat ta’ infiq, kif ukoll mil-lat ta’ timeline?

Response (BORG, IAN)

Ninforma lill-Onor. Interpellant illi fil-każ tal-proġett tal-Kappara, kien hemm diversi targets stabiliti tul ix-xogħlijiet, dan bl-għan prinċipali li jinbnew żewġ flyovers u roundabout fil-Junction tal-Kappara sabiex il-konġestjoni tat-traffiku fiż-żona li taqdi aktar minn 90,000 vettura kuljum tkun indirizzata. Nibda billi nsemmi li kif ippjanat : · Ix-xogħol fuq is-sit inbeda f’April tat-2016, billi ġew traspjantati l-palmi li kien hemm fir- roundabout eżistenti, dan filwaqt li tlestew diversi toroq alternattivi · Sar xogħol estensiv biex jitwessaw it-toroq eżistenti fuq in-naħa tal-Gżira dan filwaqt li nbnew service culverts u ġew imressqa s-servizzi infrastrutturali · L-ewwel toroq, parti mill-proġett ingħataw l-asfalt f’Marzu 2017, ftit inqas minn sena wara li kien inbeda l-proġett u għaldaqstant setgħu jinbdew jintużaw is- slip roads tal-ġnub · F’April tal-2017 beda jitpoġġa fil-post l-ewwel flyover u beda jintuża mill-pubbliku f’Lulju tal-istess sena · Iż-żewġ pontijiet imbagħad infetħu għall-pubbliku, kif ippjanat f’Settembru tal-2017. Wara dan bdew jitwessgħu it-toroq fuq in-naħa ta’ San Ġwann u t-toroq kollha kienu disponibli għall-pubbliku fl-ewwel jiem ta’ Jannar tal-2018, kif ippjanat. Dan kien possibli ukoll billi xi wħud mix-xogħijiet saru anke matul il-lejl biex jinħoloq l-inqas inkonvenjent għall-pubbliku u x-xogħol jitħaffef. Għaldaqstant, il-proġett ġie inawgurat fil-25 ta’ Jannar tal-2018 u bħalissa qed isir xogħol ta’ snagging . L-Awtorità ser tkun qed tagħmel ukoll xi xogħlijiet fil-madwar, bhal perezempju ser tkun qed taħdem fuq underpasses għall-uzu pedonali u ser tkun qed tagħmel ukoll xi xogħol fuq it-toroq tal-universita’ biex tagħti access aħjar għall- underpass li nbidel bħala parti mill-proġett tal-Kappara stess. Il-proġett huwa stmat mat-€23 miljun mill-lat ta’ xogħlijiet, huwa parzjalment iffinanzjat mill-Unjoni Ewropwa u jifforma parti min- network TEN-T; dan filwaqt li bħalissa qed jiġu iffinlizzati l-kontijiet u jidher li l- budget imsemmi ser ikun qed jinżamm ukoll.

Ħ’Attard – xogħlijiet fuq triq ġdida

Question

Jista’ l-Ministru jgħid meta hu pproġettat li x-xogħol fuq triq ġdida f’Ħ’Attard, parrallela għal Triq in-Nutar Zarb f’Ħ’Attard, jibda? Kemm hu maħsub li dan ix-xogħol se jieħu żmien?

Response (BORG, IAN)

It-toroq ewlenin li jwasslu mill-Imrieħel lejn Birkirkara, Ħ'Attard u diversi lokalitajiet oħra fin-naħa ta' fuq tal-pajjiż jinkludu għadd ta' diffikultajiet strutturali li ta' kuljum ixekklu eluf ta' persuni li jgħaddu minn dawn l-inħawi. F'ċertu partijiet ta' din ir-rotta, it-triq eżistenti tidjieq ħafna, saħansitra tonqos għal korsija ( lane ) waħda. Dawn l-ostakli joħolqu konġestjoni tat-traffiku bil-vetturi, li jwasslu għal żieda fit-tniġġiż tal-arja f'dawn il-lokalitajiet. Fl-istess waqt, qed jintlaqtu ħażin ukoll iż-żoni residenzjali ta' Ħ'Attard, Ħal Balzan, Birkirkara u l-inħawi, hekk kif ħafna sewwieqa jfittxu li jevitaw din ir-rotta ewlenija billi jgħaddu minn toroq residenzjali. Dan ifisser aktar inkonvenjenti għar-residenti li jgħixu f'dawn l-inħawi. Sabiex dawn id-diffikultajiet jittaffew, id-Direttorat tat-Toroq u l-Infrastruttura ta' Transport Malta qed jipproponi proġett ta' titjib li jinkludi disinn ġdid għal dawn it-toroq arterjali u għal xi toroq sekondarji oħra eżistenti, sabiex jitneħħew l-ostakli li hemm bħalissa waqt li jiġu introdotti diversi faċilitajiet ġodda għal aktar sigurtà u effiċjenza għal dawk kollha li jużaw it-toroq, fosthom sewwieqa, residenti, dawk li jsuqu r-roti u oħrajn. Il-proposta tressqet quddiem l-awtoritajiet tal-ippjanar sabiex tiġi studjata skont il-proċeduri stabbiliti, ħalli jkunu jistgħu jinkisbu l-permessi tal-iżvilupp meħtieġa. Fl-istess waqt, qed jiġu kkonsultati wkoll l-entitajiet kollha konċernati, sabiex jiġu ffinalizzati l-pjanijiet ta' dan il-proġett. Periti tad-Direttorat qed ifasslu wkoll ir-rekwiżiti tekniċi tal-proġett sabiex dalwaqt toħroġ is-sejħa għall-offerti għall-kuntratturi meħtieġa biex dan il-proġett jitwettaq. Il-Ministeru, permezz ta' Transport Malta u dalwaqt anke permezz tal-aġenzija ġdida li ser tieħu ħsieb l-iżvilupp infrastrutturali tat-toroq f'pajjiżna, huwa impenjat li jkompli jinvesti f'diversi miżuri biex intejbu l-kwalità tat-toroq tagħna, biex nagħmluhom aktar sikuri għal dawk kollha li jużawhom, u biex niżviluppaw mezzi ta' vjaġġar aktar sostenibbli li jilħqu l-aspirazzjonijiet tal-lum u tal-futur, ta' pajjiżna.

Il-Mosta — Triq il-Kungress Ewkaristiku - xogħol ta' għoti ta' tarmak

Question

Jista' l-Ministru jgħid meta hu maħsub li jibda x-xogħol ta' għoti ta' tarmak mill-ġdid fi Triq il-Kungress Ewkaristiku fil-Mosta peress li din it-triq kienet imwiegħda li ssir mill-Gvern kważi sena u nofs ilu?

Response (BORG, IAN)

Ninforma lill-Onor. Interpellant li Transport Malta qed taħdem fuq lista ta’ interventi f'diversi lokalitajiet liema lista qed issir skont il-prijoritajiet li jirriżultaw.

Planning Authority – każijiet irrifjutati u li ttelgħu tribunal

Question

Jista’ l-Ministru jgħid kemm huma dawk il-każijiet li l-Awtorità tal-Ippjanar (PA) irrifjutat permessi għalihom u li ttelgħu Tribunal fis-sena 2016 u fis-sena 2017 (listi separati)? Jista’ jgħid ukoll kemm huma l-każijiet li fl-aħħar mill-aħħar it-Tribunal ta permess, minkejja li l-PA ma kenitx tat permess fis-sena 2016 u fis-sena 2017 (listi separati)?

Response (BORG, IAN)

B’referenza għall-mistoqsija parlamentari 3750, it-Tribunal ta’ Reviżjoni tal-Ambjent u l-Ippjanar irċieva ħames mija u tmienja u tletin (538) appell kontra rifjut ta’ applikazzjonijiet tal-ippjanar (planning applications) matul is-snin 2016 u 2017 li minnhom ġew milqugħa tmienja u tmenin. It-tabella t'hawn taħt taqsam dawn l-ammonti sena b’sena kif mitlub mill-Onor. Interpellant. Appeals Against PA Refusal Received Appeals Upheld 2016 232 77 2017 306 11 Din l-informazzjoni nġabret mis-sistema tal-informatika tal-Awtorità tal-Ippjanar fuq appelli ndikati bħala ‘Appell kontra rifjut’ li ġew sottomessi fis-snin 2016 u 2017.

Planning Authority – applikazzjonijiet għal bini iktar għoli minn għaxar sulari

Question

Jista’ l-Ministru jgħid kemm huma l-applikazzjonijiet u l-istħarriġ preliminari li tressqu quddiem l-Awtorità tal-Ippjanar (PA) biex jittella’ bini iktar għoli minn għaxar sulari?

Response (BORG, IAN)

Ninforma lill-Onor. Interpellant li fil-preżent hemm tnejn u għoxrin applikazzjoni pendenti għand l-Awtorità tal-Ippjanar li għandhom x’jaqsmu ma’ bini iktar għoli minn għaxar sulari. Hawn taht qed tiġi prezentata lista b’ dettalji tal-applikazzjonijiet li ġew sottomessi quddiem l-Awtorità tal-Ippjanar biex jittella’ bini iktar għoli minn għaxar sulari u liema applikazzjonijiet għadhom qed jigu processati. PA Nos. Proposal Location Local Council Status PA2765/16 To sanction demolition of building partly covered by dangerous structure [DS 104/14] in view of frail block and proposed construction of basement parking levels with overlying business tower 'Ta' Xbiex Palace', Triq Testaferrata / Triq Enrico Mizzi/, Triq Emmanuel Galizia, Ta'Xbiex, Malta Ta’ Xbiex Pending PA8158/17 Demolition of existing, excavation and construction of residential development with underlying basement parking levels, commercial space, general landscaping and open central pjazza 105, Telghet Birkirkara c/w, Sqaq Ciantar, San Giljan, Malta San Giljan Pending PA7446/17 To excavate the site up to three levels below Triq Hal Qormi, accommodating two levels of car parking as well as a showroom. To construct an office block within a medium-rise building and to retain the existing old building. Site at, Triq Hal-Qormi c/w Triq l-Erba Qaddisin c/w, Triq Valletta, Qormi, Malta Qormi Pending PA6697/17 To demolish existing, vacant, dilapidated ice cream factory. To dismount and re-erect existing front façade from Triq D`argens, to construct four levels of basement car park levels plus eighteen above ground levels of offices (Class 4A). 179, Wembley Ice Cream Factory, Triq D'Argens /, Triq De Brocktorff, Msida, Malta Msida Pending PA2282/17 Utilising the FAR policy. Construction of Hybrid Development, consisting of 13 storey mid-rise & 29 storey highrise development. Consisting of an underground parking & service facilities (4 floors), with overlying commercial facilities class 4A, 4B & 4D, a supermarket and residential units. Golden Harvest, Misrah Turu Colombo / Triq Nazju Ellul / Triq Manoel De Vilhena / Triq Luqa Briffa /, Triq Reid, Gzira, Malta Gzira Pending PA6252/17 Demolition of existing 4 star hotel and the Spa Wing of the 5 star hotel, and excavation of site. Construction of 3 levels of below ground car parking; construction of ground floor retail complex (mix of Class 4B and Class 4C) under a landscaped Public Open Space; and construction of residential complex rising to a maximum of 15 floors above street level. Development also to include complete refurbishment (including internal alterations) of the existing 5 star hotel, the construction of five additional floors on the hotel tower and construction of stepped hotel block rising to 13 floors above the plaza, in place of the Spa Wing. Fortina SPA Resort, Ix-Xatt Ta' Tigne &, Triq Censu Xerri, Sliema, Malta Sliema Pending PA6705/17 Proposed lateral extension and amendments to the approved development in PA 581/16 for the construction of underground car parking , mixed commercial uses including class uses 4A, 4B, 4C, 3C, 2C, 6A, and supermarket. The Quad Business Towers, Triq il-Merghat c/w, Triq l-Esportaturi, Birkirkara, Malta Birkirkara Pending PA6704/17 Demolition of existing building and construction of three levels of parking (one below road level), underlying proposal for Class 4A offices, including Class 4C commercial at street level. 11-17, Triq il-Moll tal-Knisja /, Triq Belt Il-Hazna, Marsa, Malta Marsa Pending PA6729/17 To construct underground reservoir, 5 levels of underground car parking, mixed commercial uses utilizing the FAR policy to construct a 17 storey high rise building to include class uses 4A, 4B, 4C & 4D. Site at, Triq Is-Salib Ta' l-Imriehel, Birkirkara, Malta Birkirkara Pending PA8058/17 Proposed demolition of existing petrol station and excavation of two levels of underground parking. Proposed Showroom at ground floor and mezzanine level and Class 4A offices from 2nd to 13th floor and receded floor. Proposal includes landscaping at street level in line with FAR Policy. Paul & Rocco Gzira Ltd., Triq l-Imsida, Gzira, Malta Gzira Pending PA6239/16 Construction of new hotel having two basement floors of car parking from excavation carried out under permit PA6712/16, construction of two floors of hotel facilities and services and fifteen floors of bedrooms (178 rooms) and pool and pool deck on roof, proposal also includes widening of tunnel underneath road to provide vehicular access to basement from seaward side and request for beach concession. Seaview Hotel, Triq it-Trunciera c/w Triq L-Imsell c/w, Triq Il- Lacci, San Pawl il-Bahar, Malta San Pawl il-Bahar Pending PA1137/17 Change of use from residential apartments into a 64 room Class 3b hotel. Proposal includes internal alterations and addition of four extra floors. Development is to extend over the airspace at the adjacent pebbles hotel. Proposal includes the change of use from approved gaming parlour into a Class 4D restaurant as an extension to the approved restaurant in PA 5114/10. Sliema Pending Decision PA6571/16 Demolition of the existing building and construction of a three star hotel with commercial class 3B. San Giljan Pending Decision PA5064/17 To construct extension to hotel (Class 3B) on levels 7-9 overlying setback floor including other additions and alterations. Gzira Pending Decision PA5335/17 Proposed total demolition of existing premises and construction of new hotel including a store and restaurant (Class 4D) at lower intermediate level, lobby area at ground floor, hotel accommodation from level 0 to 9 (Class 3B) and pool deck area with restaurant (Class 4D) at roof level. San Giljan Pending Decision PA6493/17 Demolition of existing building and construction of 2 basement levels for storage and ancillary facilities, 2 class 4d restaurants at ground floor level and class 3b hotel comprising 97 rooms subdivided in 9 levels. San Giljan Pending Recommendation PA8072/17 Change of use from approved not built residential development covered by PA 4041/16 to a class 3B - 3star hotel including proposed signage. San Giljan Pending Recommendation PA9878/17 Amended application to PA 3199/16 for (Class 3A) tourist accommodation proposing total demolition of existing premises and construction of Class 3B Hotel including underlying basement, ground level reception / guestrooms, guestrooms from levels 1 – 9 and breakfast room / bar & lounge areas are recessed level 10 San Giljan Pending Recommendation PA10116/17 Proposed demolition of existing property and construction of three star BB Hotel (Class 3B), including basement car-parking, restaurant facilities at lower levels, hotel accommodation from level 1 to 10 and pool deck area at level 10. San Giljan Pending Recommendation PA10738/17 Internal alterations to an existing dwelling and construction of 11 new floors for a Class 3B Hotel comprising a total of 39 rooms. Sliema Pending Recommendation PA10810/17 Amended application to PA 5527/17 in view of making internal and external alterations and to construct another floor to a class 3B hotel. San Giljan Pending Recommendation PA10842/17 Proposed total demolition of existing premises and construction of new hotel including a store, laundry room, changing room, toilet and game room at level -1, lobby area, office, toilet, breakfast room (Class 4D) at ground floor, cafeteria at first floor (Class 4D), hotel accommodation from level 1 to 10 (Class 3B) and pool deck area with bar (Class 4D) at roof level. San Giljan Pending Recommendation

Bypass tal-Imrieħel – lift stallat fil-pedestrian footbridge

Question

Jista' l-Ministru jagħti data definittiva meta se jiġu stallati u jibdew jaħdmu l-lifts li suppost diġà jinsabu stallati fil-pedestrian footbridge li jinsab fil-bypass tal-Imrieħel?

Response (BORG, IAN)

Transport Malta ħadet il-passi kollha li jistipula l-kuntratt biex tassigura li d-dewmien ma jkomplix, inkluż anke rreġistrat protest ġudizzjarju. Sadanittant, infurmat li l-lifts ġew ordnati u għandhom jitwaħħlu sal-aħħar ta’ Frar 2018.

Bypass tal-Imrieħel – pedestrian footbridge – dħul minn riklami

Question

Jista' l-Ministru jgħid kemm kien id-dħul tal-Gvern Malti jew tal-Awtorità għat-Trasport f'Malta mir-reklami li qegħdin jidhru mal-pedestrian footbridge li jinsab fil-bypass tal-Imrieħel?

Response (BORG, IAN)

Ninforma lill-Onor. Interpellant li ninsab infurmat li Transport Malta ma ddaħħalx flus mir-reklami.

Għawdex – xogħlijiet fuq il-Port tal-Imġarr

Question

Jista’ l-Ministru jgħid x’sar f’xogħlijiet ta’ tiswija s’issa u kemm ġew jiswew dawn ix-xogħlijiet fuq il-moll tal-Port tal-Imġarr Għawdex (eżattament taħt fejn hemm il-gabbani u ż-żona fejn jittrakka l-vapur bil-lejl sa fejn tittrakka l-Patrol Boat tal-Forzi Armati)? Ftit ta’ żmien ilu is-surveyors tat-trasport sabu dabien fond diversi metri taħt dan il-moll b’riskju kbir għall-ħajjiet tal-pubbliku, impjegati u anki l-ammont ta’ vetturi li jipparkjaw hemm f’każ li jċedi dan il-moll.

Response (BORG, IAN)

Ninforma lill-Onor. Interpellant li jien infurmat li saru tiswijiet ta’ ħsarat u manutenzjoni fuq il-mollijiet fl-Imġarr, Għawdex li jammontaw għal €241,902.64. Madanakollu, Transport Malta ma għandhiex konjizzjoni ta’ xogħlijiet partikolari fil-parti msemmija, cjoe’ fejn jitrakka l-vapur bil-lejl sa fejn il-Patrol Boat tal-Forzi Armati. Is-survey imsemmi fl-Imġarr sar min Transport Malta bħala parti minn monitoraġġ tal-infrastruttura marittima. Dan qiegħed jintuża għad-disinn tat-tiswijiet meħtiega u preparamenti għal sejħa għall-offerti għal xogħlijiet fix-xhur li ġejjin. Jien infurmat li ma hemmx ħsarat taħt dan il-moll b’riskju imminenti għall-pubbliku, impjegati jew vetturi li jipparkjaw hemm jew riskju li jċedi dan il-moll kif qed jagħti l-impressjoni l-Onor. Interpellant.

Ministeru għat-Trasport, l-Infrastruttura u Proġetti Kapitali – trasferimenti/pagamenti f’kontijiet ta’ bank

Question

Jista' l-Ministru jgħid jekk sarux trasferimenti u/jew pagamenti, inkluż iżda mhux biss, ta' pagi, f'kontijiet li jinsabu fil-bank li l-isem u d-dettalji tiegħu qegħdin jingħataw separatament, mill-Ministeru u/jew mill-entitajiet kollha li jaqgħu taħtu mis-sena 2013 sad-data li tiġi mwieġba din il-mistoqsija parlamentari? Jekk iva, jista' jgħid dwar xiex kienu dawn it-trasferimenti u/jew pagi u kemm kien it-total tal-ammont li ġie trasferit?

Response (BORG, IAN)

Bi tweġiba għal mistoqsija parlamentari 2911, skont ir-records tal-Ministeru għat-Trasport, Infrastruttura u Proġetti Kapitali u tal-entitajiet kollha li jaqgħu taħtu, mis-sena 2013 sal-lum, ma sarux trasferimenti u/jew pagamenti, inkluż iżda mhux biss, ta' pagi, f'kontijiet li jinsabu fil-bank li l-isem u d-dettalji tiegħu qegħdin jingħataw separatament.

Vjaġġi tal-merkanzija bejn il-Port tal-Imparr u l-Port il-Kbir

Question

Jista’ l-Ministru jgħid għaliex mhux qed isiru vjaġġi tal-merkanzija bejn il-Port tal-Imġarr u l-Port il-Kbir? B’referenza għall-mistoqsija parlamentari 26091 tat-12-il leġiżlatura, jista’ l-Ministru jgħid jekk l-imsemmija kumpanija waslitx f’xi ftehim?

Response (BORG, IAN)

Nitlob lill-Onor. Interpellant iressaq din id-domanda lill-Ministru kkonċernat.

Xarabanks mimlija li jitilqu mill-Port tal-Imġarr

Question

Peress li x-xarabanks li jitilqu mill-Port tal-Imġarr ikunu mimlija, jista’ l-Ministru jgħidilna jekk għandux soluzzjoni għall-Għawdxin li jkunu qed jistennew ix-xarabank fid-diversi stages fl-irħula li minnhom tgħaddi x-xarabank hi u sejra għall-Belt Victoria, ladarba li numru ta’ xarabanks qed jibqgħu vojta fil-Port tal-Imġarr?

Response (BORG, IAN)

Ninforma lill-Onor. Interpellant li Transport Malta ser tkun qed twettaq stħarriġ propju fuq dawk ir-rotot li jitilqu mill-port tal-Imġarr Għawdex. Dan sabiex tkun tista’ ssir evalwazzjoni tas-sitwazzjoni hekk kif deskritta f’din il-mistoqsija parlamentari u sabiex jiġu identifikati miżuri li jkun hemm bżonn jittieħdu sabiex jiġu ndirizzati xi nuqqasijiet li jistgħu jeżistu.